Bathroom Renovation Cost Estimator: Build a Real 2026 Budget
Estimating a bathroom renovation is really just eleven line items and one honest contingency. Here's how to build the number yourself.
Part of these guide hubs
There's a difference between a price and an estimate. A price is what one contractor will do it for. An estimate is what the work should cost anywhere — and once you can build one, no bid can surprise you.
The Eleven Line Items in Every Bathroom Renovation
- Demolition and disposal: $600–$1,800
- Rough plumbing (no relocation): $900–$2,200 · with relocation: $2,500–$6,000
- Electrical, GFCI and exhaust fan: $650–$2,000
- Framing and blocking: $300–$1,200
- Waterproofing and backer board: $500–$1,600
- Tile material: $3–$18 per sq ft · tile labor: $9–$22 per sq ft
- Tub or shower base: $450–$3,500
- Shower glass: $700–$3,200
- Vanity, top and faucet: $800–$4,500
- Paint, trim and accessories: $400–$1,200
- Permits and general conditions: $400–$1,500
A Worked Example: 45 Sq Ft Hall Bath
Keep the layout, replace everything, mid-range finishes. Demo $1,100 · plumbing $1,600 · electrical $950 · waterproofing $900 · tile 110 sq ft at $6 material and $14 labor = $2,200 · shower base and valve $1,300 · glass door $1,500 · vanity package $1,900 · paint and trim $700 · permits $600. Subtotal $12,750. Add 12% contingency: $14,280.
Run the same math for your bathroom automatically.
Open the Bathroom Renovation Budget CalculatorWhere Estimates Go Wrong
- Forgetting tile labor is usually double tile material.
- Pricing a vanity but not the top, faucet, drain and install.
- Ignoring the exhaust fan and code-required makeup air.
- Assuming the shower glass is included — it's almost always a separate vendor.
- No contingency. This is the single most common budget failure.
Trimming the Estimate Without Cheapening It
Tile the wet walls to ceiling and paint the rest. Choose a stock vanity in a standard width. Keep to 12×24 porcelain rather than mosaic fields. Reuse the existing toilet location. You can save $3,000–$5,000 on a mid-range bath with those four calls alone, and no guest will ever notice.
FAQ
How do I estimate a bathroom renovation cost?
Total the eleven standard line items — demo, plumbing, electrical, framing, waterproofing, tile, shower or tub, glass, vanity, paint and permits — then add a 10–15% contingency. That total should track within 15% of real bids in your market.
What percent of a bathroom renovation is labor?
Roughly 55–65% in 2026. In high-cost metros like San Francisco and New York it can reach 70%, which is why identical material lists produce wildly different totals across the country.
How much contingency should I hold?
Ten percent for a home built after 2000, and fifteen to twenty percent for anything pre-1980 where plumbing, wiring and subfloor surprises are common.
Written by Javed Niamat
Javed Niamat is a home renovation cost analyst and the founder of RenoCalc Hub. He tracks US remodeling labor rates, material pricing and contractor bids across all 50 states, and builds the free calculators behind every guide on this site.
More about the author →Ready to run the numbers?
Try the free calculators on the home page — no signup, no email.
Open Calculators